The current structure would be dismantled and a new one built in the same location. Discussions are underway to make the temporary bridge at the Koval intersection a mile east of the Strip permanent. BLVD is scheduled to open sometime in 2025.įlamingo bridge: One good development coming out of Las Vegas’ Formula One saga could be a traffic improvement on Flamingo. In addition, the first three tenants for the center were announced: Adidas, Puma and H&M.
Parking is free through the end of the year, then will be $20 per day with a four-hour grace period.īLVD topped off: The 400,000-square-foot, retail-dining-entertainment center going up fast on the Strip in the location of the former Hawaiian Marketplace was topped off last week. The 67-story tower contains 3,644 rooms, a 150,000-square-foot casino with 1,300 slots and 128 table games, 36 restaurants and bars (21 are open now), a theater, nightclub, high-end retail and convention space. The massive $3.7 billion resort that’s been in some stage of building (or just sitting) since 2007 started fast with a welcome bash featuring Justin Timberlake performing in front of a long list of A-list VIPs before the public descended. 5, the long- awaited Fontainebleau followed on Dec. Another week, another big opening in Las Vegas.Īctually, it’s rare for two major casinos to open in one month, but following the debut of Durango Casino on Dec.